BLOG

08

2024

-

06

Mold design and manufacturing warehousing process

Mold management system Design, manufacture, warehousing

Mold management system
Design, manufacture, warehousing
1. According to the company's new product development plan, the technical department shall provide the product parts drawing and decide according to the office meeting of the general manager's office:(a) entrust external units to design and manufacture molds. The specific mold manufacturing plan shall be decided by the technical department, and contact the outsourcing manufacturers and follow-up work. (B) The company undertakes the manufacturing, and the mold designer of the technical department designs the mold drawing (assembly drawing, part drawing and material list) according to the product part drawing. Eject the mold manufacturing schedule.
2. The technical department or relevant departments shall complete the required materials within the time of the mold manufacturing schedule. Mold manufacturing personnel in the manufacture of molds, in principle, should have a mold drawing and process card;
3. After the mold manufacturing is completed, the technical department shall report to the production management department, and the production management department shall arrange the mold calibration equipment, and the mold designers of the technical department shall calibrate the mold. In the process of mold calibration, the operators of stamping workshop shall cooperate and participate;
4. After the mold is verified to be qualified, it shall be countersigned by the production management department and the quality control department of the technical department (checking the quality of product parts). And by the technical department to the use of the department, the use of the department should be rejected without the above countersign of the mold, after the overhaul of the mold also need to go through the above verification procedures.
5, outsourcing manufacturers to make the mold, by the technical department of the Department of production management, stamping workshop, quality control department to make a correct assessment of the operability, safety, reliability of the mold, the dimensional accuracy of the product inspection, qualified approval, by the technical department, production management department, quality control department countersigned to the use of the department.

 

Message

%{tishi_zhanwei}%

@ Taizhou Huangyan Maijun Plastic Mold Co., Ltd www.300.cn SEO

Business License